Conference Proceedings
Computers in Mining, Southern Queensland
Conference Proceedings
Computers in Mining, Southern Queensland
Use of Computerised Management Systems for the Blair Athol Coal mine Project
As Project Managers for the Blair Athol Coal Mine Project, CMPS selected a number of computer systems to assist in project control. The areas where computers were used were: 1) Planning & Scheduling 2) Procurement Reporting 3) Document Control 4) Accounting 5) Cost Control 6) Control of project management and engineering manhours The computer packages selected were generally effective in their own areas._x000D_
During 1982, CMPS acquired an in-house project control package called GC/Cue._x000D_
Project control systems for the project are progressively being set up on this system._x000D_
The advantages of this type of system are: 1) Improved accessibility of information, due to on-line operation and the use of VDU's. 2) Improved turn around time for computer runs and production of reports. 3) Improved presentation and format of reports. 4) Lower costs.
During 1982, CMPS acquired an in-house project control package called GC/Cue._x000D_
Project control systems for the project are progressively being set up on this system._x000D_
The advantages of this type of system are: 1) Improved accessibility of information, due to on-line operation and the use of VDU's. 2) Improved turn around time for computer runs and production of reports. 3) Improved presentation and format of reports. 4) Lower costs.
Contributor(s):
J Alder
-
Use of Computerised Management Systems for the Blair Athol Coal mine ProjectPDFThis product is exclusive to Digital library subscription
-
Use of Computerised Management Systems for the Blair Athol Coal mine ProjectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1983
- PDF Size: 0.093 Mb.
- Unique ID: P198301032