Skip to main content
Conference Proceedings

Design and Construction of Tunnels and Shafts, Melbourne - 2nd Australian Tunnelling Conference

Conference Proceedings

Design and Construction of Tunnels and Shafts, Melbourne - 2nd Australian Tunnelling Conference

PDF Add to cart

Recent Developments in Shaft Sinking and Tunnelling in Melbourne's Sewerage System

One of the responsibilities of the Melbourne and Metropolitan Board of Works is to provide a sewerage system for the metropolis of Melbourne which now contains over 2.5 million people. In providing this sewerage system it was necessary for the Board to embark on a large tunnelling programme some 20 years ago. As a result of this extensive tunnel construction programme, tunnel boring machines and shaft sinking methods have been developed to cope with the soft ground and soft to medium rock found in the southern and eastern areas of Melbourne where the majority of the recent tunnelling has been carried out. While in the last few years radical changes in construction methods have not been made, development has continued and improvements have been made, which have enabled the Board to extend the limits of the ground conditions in which it can efficiently construct shafts and also tunnels with boring Machines.
Return to parent product
  • Recent Developments in Shaft Sinking and Tunnelling in Melbourne's Sewerage System
    PDF
    This product is exclusive to Digital library subscription
  • Recent Developments in Shaft Sinking and Tunnelling in Melbourne's Sewerage System
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1976
  • PDF Size: 0.462 Mb.
  • Unique ID: P197602007

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.