Skip to main content
Conference Proceedings

Design and Construction of Tunnels and Shafts, Melbourne - 2nd Australian Tunnelling Conference

Conference Proceedings

Design and Construction of Tunnels and Shafts, Melbourne - 2nd Australian Tunnelling Conference

PDF Add to cart

The Role of Geomechanics in the Construction Phase of A Major Tunnelling Project

Geomechanics is one of the more specialised aspects of site supervision on a major tunnell- ing project. The controlled deformation of a rock mass as a result of tunnelling and the knowledge of loading of temporary and permanent underground supports are important for safe, economic construction. These basic parameters depend on the construction method and sequence and the geological conditions through which a tunnel is driven. Thus geomechanical monitoring during the construction phase provides feedback to a design team and allows any revisions to a design to cater for local conditions not revealed by earlier investigations. Detailed geological mapping is an integral part of geomechanics in the construction phase._x000D_
It serves as a monitor on pre construction predictions and also forms part of the as- constructed record. If conventional excavation-techniques are adopted, geomechanics can provide a service of blast' vibration monitoring of surface structures in urban areas.
Return to parent product
  • The Role of Geomechanics in the Construction Phase of A Major Tunnelling Project
    PDF
    This product is exclusive to Digital library subscription
  • The Role of Geomechanics in the Construction Phase of A Major Tunnelling Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1976
  • PDF Size: 0.501 Mb.
  • Unique ID: P197602012

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.