The Sinking and Equipping of P49 Shaft, Mount Isa

The P49 Shaft, Hilton Mine, was sunk and equipped for Mount Ise Mines Limited by con- tractors Cementation - Thiess Joint Venture._x000D_
The leached siltstones to a depth of 150m were known to contain large volumes of water. These siltstones were cored and tested in the laboratory. Field results confirmed that cement grouting was relatively ineffective but that chemical grouting was effective. The Sm diameter shaft was sunk to a depth of 1040m. Weak strata to the full depth re- quired continuous temporary support by rock bolts and mesh before the concrete lining was poured, and made sinking conditions difficult. After completion of the shaft sinking the headframe was redesigned and modified to allow shaft equipping as a combined service and hoisting shaft with seven compartments. The shaft steelwork was designed and fab- ricated for service with high speed conveyances operating under corrosive conditions. The steelwork, weighing approximately 1500 tonnes, was installed to a high degree of accuracy which required guides not to depart from true verticality by more than 2mm over any 5m, or 15mm over the full shaft depth.
Return to parent product
  • The Sinking and Equipping of P49 Shaft, Mount Isa
    PDF
    This product is exclusive to Digital library subscription
  • The Sinking and Equipping of P49 Shaft, Mount Isa
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1976
  • PDF Size: 0.331 Mb.
  • Unique ID: P197602013

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.