The Use of Roadheading Machines in the Construction of the Liverpool Link Line
The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable rock formations. A description is given of the strata traversed by the tunnels together with descriptions of equipment and crews, excavation sequences, operating difficulties and the results achiev- ed. In addition tunnel construction is des- cribed for a difficult section where there was only O.Sm clearance between invert and a four lane vehicular tunnel below, and O.5m clearance between tunnel crown and a century old sewer above.
Contributor(s):
A D Johnson, D B Parkes
-
The Use of Roadheading Machines in the Construction of the Liverpool Link LinePDFThis product is exclusive to Digital library subscription
-
The Use of Roadheading Machines in the Construction of the Liverpool Link LinePDFNormal price $22.00Member price from $0.00