Conference Proceedings
Design and Construction of Tunnels and Shafts, Melbourne - 2nd Australian Tunnelling Conference
Conference Proceedings
Design and Construction of Tunnels and Shafts, Melbourne - 2nd Australian Tunnelling Conference
Vibration Control in Construction Blasting
A resume covering currently accepted views on blasting vibration measurement, human response, and criteria for damage is presented as background information for readers who are not conversant with blasting vibrations. This is followed by sections on vibration level estimation and blasting techniques to control vibration. Emphasis is placed on making use of the scatter in the delay intervals of half-second delay detonators, the use of smaller explosive charges for early delay numbers, and the non- use of zero-delay (instantaneous) detonators in cer`a. n cases.
Contributor(s):
A B Richards
-
Vibration Control in Construction BlastingPDFThis product is exclusive to Digital library subscription
-
Vibration Control in Construction BlastingPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1976
- PDF Size: 0.472 Mb.
- Unique ID: P197602021