Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South Africa
Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American's Mogalakwena Platinum mine, an open pit operation in South Africa moving 100 Mt/a, has recognised the value of improved material definition and is in the process of changing from blasthole to reverse circulation (RC) sampling for in-pit grade control. This is aimed at obtaining more representative samples, which are required to maximise ore recovery, minimise waste dilution and to increase the accuracy and confidence of production forecasts._x000D_
Early in the project, it was realised that the key risks for implementing RC grade control were related to change management processes, rather than failure of technology. Recognising the importance of this issue, Mogalakwena chose an integrated implementation approach that incorporates all stakeholders of the mining cycle in order to develop a process that delivers maximum value and is sustainable within an active mining environment. The following core goals were addressed over five phases of project implementation: extensive definition and design of integrated project implementation, comprising: project buy-in and ownership from all key stakeholders, including survey, geology, mine planning, drill and blast, load and haul, maintenance, supply chain and finance; and detailed analysis of all potential issues and possible solutions, allocated to stakeholders as part of the scoping process; optimising hole patterns and drilling procedures, focusing on delivering maximum value for minimum cost using multiple scenario analysis from borehole data and operational sequencing requirements; and evaluation of lessons learnt during project implementation in order to optimise the technical solution and operational efficiencies._x000D_
Although this project is not yet finalised, Mogalakwena Platinum Mine is already providing a blueprint for the effective development, implementation and optimisation of sustainable in-pit grade control RC drilling for other open pit mines within Anglo American plc._x000D_
FORMAL CITATION:Kirk, G, Muzondo, T and Harney, D, 2011. Improved grade control using reverse circulation drilling at Mogalakwena Platinum Mine, South Africa, in Proceedings Eighth International Mining Geology Conference 2011, pp 329-340 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Early in the project, it was realised that the key risks for implementing RC grade control were related to change management processes, rather than failure of technology. Recognising the importance of this issue, Mogalakwena chose an integrated implementation approach that incorporates all stakeholders of the mining cycle in order to develop a process that delivers maximum value and is sustainable within an active mining environment. The following core goals were addressed over five phases of project implementation: extensive definition and design of integrated project implementation, comprising: project buy-in and ownership from all key stakeholders, including survey, geology, mine planning, drill and blast, load and haul, maintenance, supply chain and finance; and detailed analysis of all potential issues and possible solutions, allocated to stakeholders as part of the scoping process; optimising hole patterns and drilling procedures, focusing on delivering maximum value for minimum cost using multiple scenario analysis from borehole data and operational sequencing requirements; and evaluation of lessons learnt during project implementation in order to optimise the technical solution and operational efficiencies._x000D_
Although this project is not yet finalised, Mogalakwena Platinum Mine is already providing a blueprint for the effective development, implementation and optimisation of sustainable in-pit grade control RC drilling for other open pit mines within Anglo American plc._x000D_
FORMAL CITATION:Kirk, G, Muzondo, T and Harney, D, 2011. Improved grade control using reverse circulation drilling at Mogalakwena Platinum Mine, South Africa, in Proceedings Eighth International Mining Geology Conference 2011, pp 329-340 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
G Kirk, T Muzondo, D Harney
-
Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South AfricaPDFThis product is exclusive to Digital library subscription
-
Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South AfricaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2011
- PDF Size: 1.436 Mb.
- Unique ID: P201108030