Design and Commissioning of the Ridgeway Concentrator
In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, commissioning and ramp up issues related to start up of the concentrator as well as current performance and future expansion plans. Commissioning of the plant was the culmination of six years of project planning, from discovery of the resource during the Cadia Hill drill out campaign in November 1996 to project implementation and plant operation. Current resource estimates stand at around 50 Mt with an average grade of 2.4 g/t gold and 0.8 per cent copper. At current processing rates the project life is expected to exceed ten years. The processing plant comprises a 9.75 m (32 ft) diameter Fully Autogenous (AG) mill, a single 6.7 m (22 ft) diameter ball mill, pebble crushers, gravity gold recovery circuit and flotation plant. Upgrades to the existing infrastructure and manning requirements at Cadia will be discussed as well as the resultant impacts on operating costs for the operation. The processing plant was expected to deliver 290 000 ounces of gold and 30 000 tonnes of copper in concentrate in its first full year of operation and progress against that goal will be presented.
Contributor(s):
S Hart, P Griffin, F Cesnik, D Gordon, B Clements
-
Design and Commissioning of the Ridgeway ConcentratorPDFThis product is exclusive to Digital library subscription
-
Design and Commissioning of the Ridgeway ConcentratorPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2003
- PDF Size: 0.612 Mb.
- Unique ID: P200304022