Skip to main content

Publication sale now on, get up to 70% off

Conference Proceedings

Eighth Mill Operators' Conference

Conference Proceedings

Eighth Mill Operators' Conference

Publication sale now on, get up to 70% off

PDF Add to cart

Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa Mines

Recently Mount Isa Mines undertook a study to review the lead-zinc orebodies to extent of resource and reserves and determine the new life-of-mine schedule, as the Mount Isa and Hilton orebodies had not be reviewed for many years. Also, the recovered value of the Mount Isa, Hilton and George Fisher orebodies had been increased by major performance improvements in the lead-zinc concentrator. The Mount Isa Lead-Zinc concentrator processes fine-grained lead-zinc ore from the Mount Isa, Hilton and George Fisher orebodies. These orebodies have varying levels of pyrite and large variation in the grain size and texture of the galena, sphalerite and pyrite. This variation has a large effect on the recovery of the lead and zinc in the concentrator. Some ores achieve 90 per cent recovery at target grades, yet other ores are unable to achieve saleable' concentrate grade, with no metal being recovered to concentrate and therefore effectively losing the contained metal to the final tailings. Models were created to predict the metallurgical performance of these orebodies, to better reflect the variation that occurs. These improved metallurgical models and economic data allowed the determination of the Net Smelter Return (NSR) for each block in the geological block model. This NSR is the return to MIM of the metals contained in concentrate. The NSR was used as the cut-off grade criteria when determining the value of the ore. This formed the basis of the lead-zinc life-of-mine schedule and the optimisation of the lead-zinc business.
Return to parent product
  • Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa Mines
    PDF
    This product is exclusive to Digital library subscription
  • Metallurgical Performance Models to Improve Cut-Off Grade Determination at Mount Isa Mines
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2003
  • PDF Size: 0.666 Mb.
  • Unique ID: P200304012

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.