Skip to main content

Publication sale now on, get up to 70% off

Conference Proceedings

Eighth Mill Operators' Conference

Conference Proceedings

Eighth Mill Operators' Conference

Publication sale now on, get up to 70% off

PDF Add to cart

Mineralogy Controlling Metallurgy at Ernest Henry Mining Revisited

Ernest Henry Mining Pty Ltd started production in August 1997. The Ernest Henry orebody consists of two distinct parts, a complex supergene ore zone overlying a primary ore zone. The economic copper minerals in the supergene ore were chalcocite, bornite, secondary chalcopyrite and native copper while the primary zone has only chalcopyrite. The variability of the supergene zone made concentrator operation difficult and predicting metallurgical performance using mineralogy essential to establish the capabilities of the concentrator. A paper presented at the 1998 Mine to Mill Conference entitled Mineralogy Controlling Metallurgy at Ernest Henry Mining (Barnes, Strohmayr, Brindley and Munro, 1998) presented the testwork and initial plant surveys that showed that the mineralogy of the ore controls the metallurgy of the concentrator. This paper presents the data obtained from the subsequent years of operation treating both the supergene and primary ore types. A review of the actual supergene mineral distribution in feed and subsequent recoveries compared to those predicted as part of the flowsheet design is also presented.
Return to parent product
  • Mineralogy Controlling Metallurgy at Ernest Henry Mining Revisited
    PDF
    This product is exclusive to Digital library subscription
  • Mineralogy Controlling Metallurgy at Ernest Henry Mining Revisited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2003
  • PDF Size: 0.342 Mb.
  • Unique ID: P200304008

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.