Skip to main content
Conference Proceedings

Eighth Open Pit Operators' Conference 2012

Conference Proceedings

Eighth Open Pit Operators' Conference 2012

PDF Add to cart

Automated Multi-Drills in Rio Tinto

Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation has more to do with improving the accuracy and consistency of mining processes and less to do with cost savings through labour reduction.A key task in most surface mines is blasthole drilling. The degree to how well this is done cascades through the downstream mining process. It impacts scheduling, excavation, slope stability, material handling, beneficiation, ore loss and final product blending. Improved blasthole drilling was identified as an objective that has a significant business case in most of Rio Tinto's surface mines.This paper describes Rio Tinto's multi-drill automation project, which has developed a robust system for automating most of the functions on several Caterpillar SKSS16 drill rigs. Automated drilling is currently being trialled in production at the West Angelas iron ore mine in the Pilbara region of Western Australia. A description of the essential elements of the automated multi-drill system is given together with an overview of how automated drilling is performed remotely from the operating bench.A review of the performance and benefits of the automated multi-drill system is given together with future plans to extend the functionality of automated drills.CITATION:McHugh, C, Stokes, A, Oppolzer, F and Rogers, B, 2012. Automated multi-drills in Rio Tinto, in Proceedings Eighth Open Pit Operators' Conference , pp 83-88 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Automated Multi-Drills in Rio Tinto
    PDF
    This product is exclusive to Digital library subscription
  • Automated Multi-Drills in Rio Tinto
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2012
  • PDF Size: 0.259 Mb.
  • Unique ID: P201208013

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.