The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging Conditions
This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceability criteria, any deviation from which would have had significant implications to the proposed design performance. The success of the design implementation within the tight time frame hinged upon the precise installation by a skilled contractor. The overall objective was achieved as a result of close collaboration between the designer and contractor ensuring all stringent quality assurance/quality control (QA/QC) aspects were met and opportunities to optimise design without compromising on performance were identified and implemented, resulting in a cost saving of over A$13 M.CITATION:Narendranathan, S, Thomas, R D H, Bungard, G P, Gumba, V and Barker, C, 2012. The importance of collaboration between designers and contractors in implementing a design in challenging conditions, in Proceedings Eighth Open Pit Operators' Conference , pp 97-102 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
S Narendranathan, R D H Thomas, G P Bungard, V Gumba, C Barker
-
The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging ConditionsPDFThis product is exclusive to Digital library subscription
-
The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging ConditionsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2012
- PDF Size: 0.337 Mb.
- Unique ID: P201208015