Skip to main content
Conference Proceedings

Eighth Underground Operators' Conference 2002

Conference Proceedings

Eighth Underground Operators' Conference 2002

PDF Add to cart

Extraction of 5 Orebody Crown Pillar at the Isa Lead Mine, Mount Isa Mines Limited, Mount Isa, Queensland, Australia

This paper describes the mining methods and strategy used to extract the 5 Orebody crown pillar at the Isa Lead Mine over the past five years. The bulk of the crown pillar was extracted by the use of sublevel open stope method. An uphole bench stope was mined to scavenge the remaining ore. Geomechanical issues associated with the crown pillar extraction are described. Stope sizes were gradually increased on a stope by stope basis. This has allowed the maximising of ore recovery while relevant risks were managed. The principles in designing ore rib pillars against various types of fill materials are also described.
Return to parent product
  • Extraction of 5 Orebody Crown Pillar at the Isa Lead Mine, Mount Isa Mines Limited, Mount Isa, Queensland, Australia
    PDF
    This product is exclusive to Digital library subscription
  • Extraction of 5 Orebody Crown Pillar at the Isa Lead Mine, Mount Isa Mines Limited, Mount Isa, Queensland, Australia
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2002
  • PDF Size: 0.35 Mb.
  • Unique ID: P200205014

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.