Conference Proceedings
Eighth Underground Operators' Conference 2002
Conference Proceedings
Eighth Underground Operators' Conference 2002
Extraction of 5 Orebody Crown Pillar at the Isa Lead Mine, Mount Isa Mines Limited, Mount Isa, Queensland, Australia
This paper describes the mining methods and strategy used to extract the 5 Orebody crown pillar at the Isa Lead Mine over the past five years. The bulk of the crown pillar was extracted by the use of sublevel open stope method. An uphole bench stope was mined to scavenge the remaining ore. Geomechanical issues associated with the crown pillar extraction are described. Stope sizes were gradually increased on a stope by stope basis. This has allowed the maximising of ore recovery while relevant risks were managed. The principles in designing ore rib pillars against various types of fill materials are also described.
Contributor(s):
J J Chen, G Varley
-
Extraction of 5 Orebody Crown Pillar at the Isa Lead Mine, Mount Isa Mines Limited, Mount Isa, Queensland, AustraliaPDFThis product is exclusive to Digital library subscription
-
Extraction of 5 Orebody Crown Pillar at the Isa Lead Mine, Mount Isa Mines Limited, Mount Isa, Queensland, AustraliaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2002
- PDF Size: 0.35 Mb.
- Unique ID: P200205014