Skip to main content
Conference Proceedings

Eighth Underground Operators' Conference 2002

Conference Proceedings

Eighth Underground Operators' Conference 2002

PDF Add to cart

Road Trains Underground - The Alternative Trucking System

In the mid-1970s, trucking ore from 400 m depth to the surface was perceived to be the practical and economic limit for metalliferous underground mines. Improvements in truck design and decline development resulted in the economic depth of haul exceeding 600 m by the mid-1990s. Today, mine operators and contractors are planning to use trucks for ore haulage from depths in excess of 1000 m._x000D_
The authors of this paper estimate that there are in excess of 300 diesel-powered trucks operating in mines in Australia, and that by the year 2005 more than five per cent of these trucks will be road trains' (ie trucks towing powered trailers or truck-trailer combinations). This paper examines the road train concept, presents cost and performance data and describes the advantages and disadvantages of the road train system as well as proposing the types of applications for use of road trains in Australian metalliferous underground mines._x000D_
Truck performance is based on payload and average speed (expressed as tonnes x kilometres per engine hour (t km/h)). A road train with a powered trailer has a large payload capacity and two engines to provide a high ratio of power to gross weight. Thus it is possible to exceed 300 t km/h per cycle for an average haulage gradient of 1:9 compared to 250 t km/h for conventional articulated dump trucks (ADTs). It is likely that road trains in excess of 100 t capacity will have application for level ore haulage at large mines in Australia.
Return to parent product
  • Road Trains Underground - The Alternative Trucking System
    PDF
    This product is exclusive to Digital library subscription
  • Road Trains Underground - The Alternative Trucking System
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2002
  • PDF Size: 0.203 Mb.
  • Unique ID: P200205030

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.