Skip to main content
Conference Proceedings

Eighth Underground Operators' Conference 2002

Conference Proceedings

Eighth Underground Operators' Conference 2002

PDF Add to cart

Shift Roster Modification to Increase Productivity at PT Freeport Indonesia Underground Mine

PT Freeport Indonesia is a copper-gold mine operation located in West Papua, Indonesia about 3500 km east of Jakarta. Current ore production is about 270 000 tpd, of which 30 000 tpd comes from underground. In the future, the production from underground will be gradually increased to reach a maximum of 115 000 tpd, as the Grasberg open pit production decreases. The current and future challenge for PT Freeport Indonesia is to fill the quota of underground miners, as Indonesia does not have a long culture of underground work. At present, there are only three active underground mines in Indonesia. The lack of underground skilled labour incited the company to develop its own skilled workforce. In the mean time, to overcome the shortage of personnel, the underground management had to find a way to improve the productivity._x000D_
Since 21 May 1998, PT Freeport Indonesia Underground Mine has operated with the new roster of two rotating shifts a day, 11 hours per shift. The previous schedule consisted of three nine-hour shifts per day, six days a week, for a total of 26 working days in a month. This change was intended to increase the productivity of the miners. With the previous roster, studies determined that the effective working time was only seven hours per shift. The new roster produces an improvement of effective working hours to about nine hours per shift. As a result, total production has increased by 33 per cent and the utilisation of production equipment has increased by 16.5 per cent._x000D_
This paper describes the background of the decision to change the work schedule, the study carried out to evaluate the benefits and drawbacks of the new shift roster, the challenges, and then compares the results for various parameters between the old schedule and the new one.
Return to parent product
  • Shift Roster Modification to Increase Productivity at PT Freeport Indonesia Underground Mine
    PDF
    This product is exclusive to Digital library subscription
  • Shift Roster Modification to Increase Productivity at PT Freeport Indonesia Underground Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2002
  • PDF Size: 0.417 Mb.
  • Unique ID: P200205043

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.