Conference Proceedings
Estimation and Statement of Mineral Reserves, Sydney
Conference Proceedings
Estimation and Statement of Mineral Reserves, Sydney
Planning the Extraction of the Lead Orebodies Below 15 Level at Mount Isa
The Black Star and Racecourse orebodies below 15 level contain a major portion of the primary silver-lead-zinc ore reserves of 56 million tonnes at 150 g/t Ag, 6.4% Pb and 6.5% Zn at Isa Mine. Extraction from this area is scheduled to begin in the early 1980's. Mining in this block will be quite com- plicated as the ore is contained in a dozen separate orebodies varying in width from 3 m to 20 m with only narrow barren pillars between them in some cases. Mining objectives which consider metal recovery, costs, environmental and safety factors, operating requirements and rock mechanics are used to compare proposals. The planning work involved in formulating mining proposals considers disposition of reserves, scheduling factors, sequence of extraction, extraction methods, haulage set-up and ventilation requirements.
Contributor(s):
D M Cox, C E Clifford
-
Planning the Extraction of the Lead Orebodies Below 15 Level at Mount IsaPDFThis product is exclusive to Digital library subscription
-
Planning the Extraction of the Lead Orebodies Below 15 Level at Mount IsaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1979
- PDF Size: 0.332 Mb.
- Unique ID: P197902039