Improvement of Blasting Productivity at Brunswick Mine

Brunswick Mine is one of the largest underground zinc/lead mines in Canada, producing 3.4 million tones of ore annually. As mining activities advance to deeper levels, ground pressure also becomes greater. To cope with the highly stressed ground, the mine has taken some strategic measures to ensure the targeted production level. Such measures include the implementation of a pastefill system and transferring the mining method from primary/secondary stoping to pillarless pyramid stoping. With the pillarless mining method, stope sizes become smaller and the number of active stopes is also less than before. In addition, mining sequence and cycle time have to be strictly followed according to production schedule. The blasting project described in this paper tackles one of the steps in the mining cycle aimed at shortening the blasting cycle time in a stope. Furthermore, this project was conducted and managed with the Six Sigma initiative in Noranda which was implemented in the fall of 1999. Like a typical process review, the blasting operation was examined by breaking it down into many steps that can be quantified and measured. Each activity was then correlated with different factors associated with blast design as well as blast operations underground. It was found that the utilisation of voids plays a key role in the blasting cycle time. With improved void utilisation ratio, blasting cycle time has been reduced from an average of 12 shifts to ten shifts per stope. This improvement translates into approximately 180 000 tonnes of ore being blasted without any increase in manpower. This paper presents the technical aspects of the study, as well as some operational issues and improvements made during the project.
Return to parent product
  • Improvement of Blasting Productivity at Brunswick Mine
    PDF
    This product is exclusive to Digital library subscription
  • Improvement of Blasting Productivity at Brunswick Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2001
  • PDF Size: 0.867 Mb.
  • Unique ID: P200104020

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.