Skip to main content
Conference Proceedings

EXPLO 2001

Conference Proceedings

EXPLO 2001

PDF Add to cart

Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?

In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting is an important step in this process chain and it's results such as fragmentation, muckpile shape and looseness, dilution, damage and rock softening effect the efficiency of downstream processes. The value created per ton of broken ore is the difference between the price it commands when sold as the final product and the cost to produce it. Traditionally, the total process in the mining industry is classified into two groups as mining and milling. These are managed as separate cost centres inspite of the interdependency. Each process has a budget and production target and emphasis is usually on maximising production (tons) and minimising cost rather than the overall profitability of the whole business unit. The efficiency of each process is considered to be satisfactory as long as they are within budget and meet the production targets. The mine and mill managers usually try to optimise each process independently rather than the entire process. This paper discusses the potential pitfalls of decreasing the drilling and blasting cost per ton of broken rock without considering its impact on downstream processes. It introduces a holistic approach to blast optimisation by identifying and measuring the leverage that blast results have on different downstream processes and then optimising the blast design to achieve the results that maximise the overall profitability rather than just minimising the drilling and blasting costs. This paper demonstrates the benefits of such a holistic approach to blasting based on computer model simulations and field studies from metal and open cut coal mining.
Return to parent product
  • Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?
    PDF
    This product is exclusive to Digital library subscription
  • Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2001
  • PDF Size: 0.476 Mb.
  • Unique ID: P200104006

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.