Skip to main content
Conference Proceedings

EXPLO 2001

Conference Proceedings

EXPLO 2001

PDF Add to cart

Wall Control Blasting Practices at BHP Billiton Iron Ore Mt Whaleback

A programme of blast improvement was initiated at the Mt Whaleback iron ore mine by BHPIO management in early-1998. One component of that work was the need to improve wall control blasting practices to better achieve the designed pit slope elements. This paper describes the geological conditions in which pit walls are developed, the mine operating equipment, the blast design concepts applied to minimise blast damage, the techniques applied in an assessment of the blast performance and the operational procedures developed to ensure that the blast concepts are effectively implemented in the production environment. Substantial changes have been implemented in both technical and operational aspects of the mining operation in order to achieve the improvements in pit wall condition, in particular recognising the need for a more flexible approach to limits blasting in response to highly variable and complex geology. The benefits to the mine are not only an improved wall condition, but increased confidence on the part of mine management that mine plans may be implemented on design and on schedule.
Return to parent product
  • Wall Control Blasting Practices at BHP Billiton Iron Ore Mt Whaleback
    PDF
    This product is exclusive to Digital library subscription
  • Wall Control Blasting Practices at BHP Billiton Iron Ore Mt Whaleback
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2001
  • PDF Size: 0.272 Mb.
  • Unique ID: P200104015

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.