Conference Proceedings
EXPLO 99
Conference Proceedings
EXPLO 99
Development of Advanced Blasting Practices at Forrestania Nickel Mines
Forrestania Nickel Mines is owned and operated by Outokumpu Mining Australia Pty Ltd and is situated 400 km east of Perth, WA in the Forrestania Greenstone Belt. Production started in late-1992 at a rate of 600 ktpa and reserves were exhausted in August 1999. Cosmic Boy is the largest of three mines worked and operates in a high stress environment with both very high and very low rock mass strength domains. Stoping commenced in 1995 using conventional benching with long hole slot rises but because of drilling and blasting problems the mine switched to airleg rising. In 1997 the mining method was changed to smaller scale up hole retreat benching with each stope requiring a slot rise of up to 16 m length. This method does not allow top access to the rise location and so airleg rising was used until mid-1998. At this stage mining was approaching areas of higher stress for which it was clear that an alternative to this entry method of rising was required. Small diameter raise boring and Cubex rigs were considered but because of the set up costs were not considered to be viable. Since the ore is relatively soft, burn cuts were developed to make use of specially designed 152, 203 and 254 mm diameter reamer bits (depending on the rise length) and drilled with conventional long hole drilling equipment. These rises are fired in one blast together with the slot rings. In the northern lower section of the mine (below 400 m) the principle stress has been estimated at 60 MPa and this causes minor strain bursting in BIF development headings and loose material to form on walls and backs. Trials of destress blasting modelled on Canadian experience has greatly reduced strain bursting at the face. However only around 300 m of development was affected and so this method had not been optimised when mine development was completed.
Contributor(s):
C J Carr, D R Rankin, J J Fuykschot
-
Development of Advanced Blasting Practices at Forrestania Nickel MinesPDFThis product is exclusive to Digital library subscription
-
Development of Advanced Blasting Practices at Forrestania Nickel MinesPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1999
- PDF Size: 0.632 Mb.
- Unique ID: P199905031