Current Drilling and Blasting Practice in the 1100 Orebody-Mount Isa
Mount Isa Mines Ltd. annually extracts 5.6 million tonnes of copper ore from the 1100 Orebody. All production is by longhole open stoping, with an increasing emphasis on pillar recovery. Drilling and blasting prac- tices have been modified to allow more efficient pillar extraction, with the evolution of a "core and shell" approach. Blast design occurs at the stope design stage, while individual blast preparation is based on detailed ring plans. A programme of blasting research involving surface and under- ground vibration monitoring and fragmentation assessment has been car- ried out in conjunction with production personnel. Drilling and blasting practice in the orebody must continue to evolve with continued research, to suit changing conditions and take advantage of new technology.
Contributor(s):
R D Evans
-
Current Drilling and Blasting Practice in the 1100 Orebody-Mount IsaPDFThis product is exclusive to Digital library subscription
-
Current Drilling and Blasting Practice in the 1100 Orebody-Mount IsaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1988
- PDF Size: 0.619 Mb.
- Unique ID: P198810002