Plant Practice at the New Celebration Gold Mine
A re-evaluation of the Hampton Boulder prospect in the early eighties resulted in a decision to proceed with mine development in December 1985. A 500 000 tpa gold treatment plant was commissioned in December 1986. The treatment facility was expanded to 1 600 000 tpa in July 1988. A tailings treatment plant to improve recoveries from harder gold bearing sulphide ores was built in December 1990. The development of an underground mine in 1991 meant that a source of sand for backfill was required. A sands plant to fulfil this requirement was commissioned during November 1991._x000D_
As of June 1992 a total of 7 710 487 tonnes of ore have been treated through the New Celebration gold plant. Total gold production from inception of the new mine until June 1992 is 545 470 ounces obtained at an average recovery of 90.1 per cent from an average gold head grade of 2.4 g/t. The combined quoted ore reserves at the end of December 1991 was 14Mt grading 1.8 g/t gold_x000D_
As of June 1992 a total of 7 710 487 tonnes of ore have been treated through the New Celebration gold plant. Total gold production from inception of the new mine until June 1992 is 545 470 ounces obtained at an average recovery of 90.1 per cent from an average gold head grade of 2.4 g/t. The combined quoted ore reserves at the end of December 1991 was 14Mt grading 1.8 g/t gold_x000D_
Contributor(s):
G Delahey, V Martins, R Dunne
-
Plant Practice at the New Celebration Gold MinePDFThis product is exclusive to Digital library subscription
-
Plant Practice at the New Celebration Gold MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1992
- PDF Size: 0.791 Mb.
- Unique ID: P199209048