Conference Proceedings
Extractive Metallurgy of Gold and Base Metals Conference, Kalgoorlie, October 1992
Conference Proceedings
Extractive Metallurgy of Gold and Base Metals Conference, Kalgoorlie, October 1992
Some Considerations in Column Flotation Pilot Plant Testwork
The metallurgical and engineering requirements that form the basis for planning column flotation Pilot Plant testwork are reviewed. Pilot plant operating issues are discussed and a basis for the testwork program formulated. The application of the testwork results to engineering design and scale-up is briefly reviewed.
Contributor(s):
A J H Newell, R A Cantrell, G A Dunlop
-
Some Considerations in Column Flotation Pilot Plant TestworkPDFThis product is exclusive to Digital library subscription
-
Some Considerations in Column Flotation Pilot Plant TestworkPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1992
- PDF Size: 0.354 Mb.
- Unique ID: P199209055