Skip to main content
Conference Proceedings

Fifth AuslMM Extractive Metallurgy Conference, Perth, October 1991

Conference Proceedings

Fifth AuslMM Extractive Metallurgy Conference, Perth, October 1991

PDF Add to cart

Copper/Cyanide in the Treatment of High Copper Gold Ores

The presence of cyanide soluble copper in gold ores can give rise to serious operational and economical difficulties in CIP and CIL operations. Cyanide consumption can result in the ore being uneconomic to treat by conventional means. Loading of copper onto carbon can also have deleterious effects on gold recovery and subsequent stripping and bullion recovery. The recovery of gold from high copper ores has been previously reviewed by Muir, LaBrooy and Cao (1989). Work undertaken for Mt Gibson Gold Project by Australian Mining Advisors with the assistance of the Chemistry Centre (WA) resulted in the patenting of a process and subsequent construction of a plant at Mt Gibson to overcome some of the difficulties encountered with copper. This paper discusses some of the work which was undertaken during laboratory investigations prior to commissioning of the plant and some further considerations for the treatment of high copper gold ores.
Return to parent product
  • Copper/Cyanide in the Treatment of High Copper Gold Ores
    PDF
    This product is exclusive to Digital library subscription
  • Copper/Cyanide in the Treatment of High Copper Gold Ores
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1990
  • PDF Size: 0.341 Mb.
  • Unique ID: P199107014

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.