Skip to main content
Conference Proceedings

Fifth AuslMM Extractive Metallurgy Conference, Perth, October 1991

Conference Proceedings

Fifth AuslMM Extractive Metallurgy Conference, Perth, October 1991

PDF Add to cart

Development of a Dynamic Simulator for CIP / CIL Plant Optimisation and Design

A dynamic simulator for CIP / CIL gold recovery plants has been developed at the Julius Kruttschnitt Mineral Research Centre within a collaborative, industrially - funded AMIRA project and with the participation of the Western Australian School of Mines. The simulator incorporates kinetic models for the leaching of gold from ore and its adsorption onto activated carbon, and the residence time distributions of the leach liquor, pulp solids and carbon in the circuit. Features of the simulator include the effects of gold loading distributions on both the ore and carbon on reaction rates, and the difference in residence time distribution between the leach liquor and pulp solids. The simulator allows for the estimation of kinetic model parameters from full scale applications, as well as some scale - up of parameters from laboratory batch tests. The laboratory tests were conducted at the WASM as part of the collaborative research project. The simulator can operate in both steady - state and dynamic modes, and has potential applications in design, optimisation and control of CIP / CIL plants.
Return to parent product
  • Development of a Dynamic Simulator for CIP / CIL Plant Optimisation and Design
    PDF
    This product is exclusive to Digital library subscription
  • Development of a Dynamic Simulator for CIP / CIL Plant Optimisation and Design
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1990
  • PDF Size: 0.812 Mb.
  • Unique ID: P199107017

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.