Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

Fifth AuslMM Extractive Metallurgy Conference, Perth, October 1991

Conference Proceedings

Fifth AuslMM Extractive Metallurgy Conference, Perth, October 1991

PDF Add to cart

In-Situ Leaching of Oxide Gold Deposits

In-situ leaching of gold deposits has not become an option largely as a result the lack of suitability of cyanide as a lixiviant due to sluggish kinetics and high dependence on the availability of oxygen. A second problem area is the excessive cost of drilling the required number of injection and production wells needed to service a wellfield capable of maintaining any significant throughput or providing and acceptable level of gold production. Well spacing in in-situ leaching operations is limited by solution life, dissolution rate, and the need for solution control. With cyanide the life of an active solution capable of dissolving significant gold is severely limited by the availability of oxygen which cannot be readily replaced while the solution remains underground. The extremely slow gold dissolution rate also necessitates excessive contact periods in order to dissolve coarse gold.
Return to parent product
  • In-Situ Leaching of Oxide Gold Deposits
    PDF
    This product is exclusive to Digital library subscription
  • In-Situ Leaching of Oxide Gold Deposits
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1991
  • PDF Size: 0.625 Mb.
  • Unique ID: P199107025

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.