Conference Proceedings
First AusIMM International Geometallurgy Conference (GeoMet) 2011
Conference Proceedings
First AusIMM International Geometallurgy Conference (GeoMet) 2011
Publication sale now on, get up to 70% off
Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation Plant
From many years practical industrial experience the author has drawn together a list of the key points to consider when embarking on a large-scale geometallurgical project. Fundamental aspects which must be considered include (but are not limited to):understanding the variability of the orebody both laterally and with depth;comminution properties and variability;flotation properties, requirements and variability - differing ore zones may have substantially different requirements for optimal performance;the role of texture - the consequences of both grain size and distribution and how the circuit will handle these;realistic expectation in terms of the financial requirements and time frame results are required within; andintegration of, and communication between key personnel within the various departments of the site (mining, geology and processing) is a fundamental aspect of any geometallurgically based processing system.An example of a highly complex nickel sulfide ore will be used as the basis of discussion.
Contributor(s):
B Newcombe
-
Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation PlantPDFThis product is exclusive to Digital library subscription
-
Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation PlantPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2011
- PDF Size: 0.579 Mb.
- Unique ID: P201110016