Skip to main content
Conference Proceedings

First AusIMM International Geometallurgy Conference (GeoMet) 2011

Conference Proceedings

First AusIMM International Geometallurgy Conference (GeoMet) 2011

PDF Add to cart

Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation Plant

From many years practical industrial experience the author has drawn together a list of the key points to consider when embarking on a large-scale geometallurgical project. Fundamental aspects which must be considered include (but are not limited to):understanding the variability of the orebody both laterally and with depth;comminution properties and variability;flotation properties, requirements and variability - differing ore zones may have substantially different requirements for optimal performance;the role of texture - the consequences of both grain size and distribution and how the circuit will handle these;realistic expectation in terms of the financial requirements and time frame results are required within; andintegration of, and communication between key personnel within the various departments of the site (mining, geology and processing) is a fundamental aspect of any geometallurgically based processing system.An example of a highly complex nickel sulfide ore will be used as the basis of discussion.
Return to parent product
  • Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation Plant
    PDF
    This product is exclusive to Digital library subscription
  • Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation Plant
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2010
  • PDF Size: 0.579 Mb.
  • Unique ID: P201110016

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.