Skip to main content
Conference Proceedings

First AusIMM International Geometallurgy Conference (GeoMet) 2011

Conference Proceedings

First AusIMM International Geometallurgy Conference (GeoMet) 2011

Publication sale now on, get up to 70% off

PDF Add to cart

Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation Plant

From many years practical industrial experience the author has drawn together a list of the key points to consider when embarking on a large-scale geometallurgical project. Fundamental aspects which must be considered include (but are not limited to):understanding the variability of the orebody both laterally and with depth;comminution properties and variability;flotation properties, requirements and variability - differing ore zones may have substantially different requirements for optimal performance;the role of texture - the consequences of both grain size and distribution and how the circuit will handle these;realistic expectation in terms of the financial requirements and time frame results are required within; andintegration of, and communication between key personnel within the various departments of the site (mining, geology and processing) is a fundamental aspect of any geometallurgically based processing system.An example of a highly complex nickel sulfide ore will be used as the basis of discussion.
Return to parent product
  • Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation Plant
    PDF
    This product is exclusive to Digital library subscription
  • Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation Plant
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2011
  • PDF Size: 0.579 Mb.
  • Unique ID: P201110016

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.