Case Histories of Hard Rock Tunnelling Using a Multi-boom Hydraulic Drilling Jumbo

The Commission called tenders for a four boom hydraulic jumbo, plus basket, on an art- iculated carrier in Sept. 1977. Atlas Copco submitted the successful tender in Jan. 1978 for the supply of a three boom jumbo, plus basket. The Promec TH470 jumbo was commiss- ioned in the 2000 m long Sophia tunnel in Nov. 1978. Adequate spare parts were not available during the first three months of operation and the hammers could not be overhauled at the recommended interval. One hammer was removed after drilling 13 600 m due to a crack in the intermediate housing. Tests were conducted with different types of drilling consumables. Both rope and Hi-teed threads were tested and found compar- able. The average penetration rate in the granite was 1.1 m/min. Initially the drillers were not experienced enough to operate the BUT 15ERH booms without causing damage to the booms and hoses. Drilling deviation espec- ially of the perimeter holes was greater than expected. It is now obvious that greater attention must be given to attracting, train- ing and retaining the right type of operator and maintenance fitter.
Return to parent product
  • Case Histories of Hard Rock Tunnelling Using a Multi-boom Hydraulic Drilling Jumbo
    PDF
    This product is exclusive to Digital library subscription
  • Case Histories of Hard Rock Tunnelling Using a Multi-boom Hydraulic Drilling Jumbo
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1981
  • PDF Size: 1.221 Mb.
  • Unique ID: P198102003

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.