Conference Proceedings
Fourth Australian Tunnelling Conference
Conference Proceedings
Fourth Australian Tunnelling Conference
Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project
The concept of the Melbourne Underground Rail Loop and the organ- isation to achieve its construction are covered in the companion papers (Reference 1, 2) and will not be repeated here. The Victorian Railways, as well as being the eventual operator of the Loop when it is completed by MURLA, have also been responsible as "Contractors" to MURLA for the construction of the "cut and cover" or "box" tunnels and related approach works located on existing Railway property. These tunnel connections link the existing suburban system to the new underground works. The following tabulation indicates the significant work volume involved in this cut and cover tunnelling exercise and which is covered in some detail by this paper.
Contributor(s):
N M Donnelly, A L Johns
-
Cut and Cover Tunnelling on the Melbourne Underground Rail Loop ProjectPDFThis product is exclusive to Digital library subscription
-
Cut and Cover Tunnelling on the Melbourne Underground Rail Loop ProjectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1981
- PDF Size: 0.877 Mb.
- Unique ID: P198102005