Conference Proceedings
Fourth Australian Tunnelling Conference
Conference Proceedings
Fourth Australian Tunnelling Conference
Project Management Procedures Adopted for Control of the Engineering Aspects of the Melbourne Underground Rail Loop Project
The scope and complexity of the Melbourne Underground Rail Loop Project and the budget restraints on the planning, design and construction of the works necessitated sound manage- ment procedures for control and co-ordination. Project Management Procedures formulated by the Principal Consultant to the Authority, John Connell - Mott, Hay 9 Anderson, Hatch, Jacobs, ensured that the Authority retained overall control of the project at all times.
Contributor(s):
M C Healy, G A Smith
-
Project Management Procedures Adopted for Control of the Engineering Aspects of the Melbourne Underground Rail Loop ProjectPDFThis product is exclusive to Digital library subscription
-
Project Management Procedures Adopted for Control of the Engineering Aspects of the Melbourne Underground Rail Loop ProjectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1981
- PDF Size: 0.151 Mb.
- Unique ID: P198102020