Skip to main content
Conference Proceedings

Fourth International Future Mining Conference 2019

Conference Proceedings

Fourth International Future Mining Conference 2019

PDF Add to cart

Real time LHD dispatch optimisation at Newcrest’s Cadia Valley Operations

This paper describes the development and implementation of a real-time load haul dump (LHD) dispatch optimisation tool that has been deployed at Panel Cave 1 and Panel Cave 2 at Newcrests Cadia Valley Operations. The tool, known as ORB, is the first known successful implementation of an optimisation-based, autonomous, real-time dispatch tool custom built for underground mining operations that co-ordinates the optimal dispatch of LHDs in a block cave in order to achieve a range of objectives while adhering to draw compliance and geotechnical constraints. It is an example of short-term interval control using real-time dispatch. This extended abstract outlines the general problem of LHD dispatch. It then discusses the preexisting business planning process in underground block cave mines and identifies key limitations to that approach. Within this context, an optimisation-based solution is presented along with an iterative approach to its development to ensure minimal time to value. The resulting tool is described at each step of its evolution from a simple pre-shift planning tool to a full cave management application. Finally, using Newcrests Cadia Valley Operations as a case study, we quantify the improvements to operations realised by ORB and the business process change it has facilitated.
CITATION: Donaldson, S, Hollis, B, Wynn, K, Potts, L and Evans, M, 2019. Real time LHD dispatch optimisation at Newcrests Cadia Valley Operations, in Proceedings Future Mining 2019, pp 198202 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Real time LHD dispatch optimisation at Newcrest’s Cadia Valley Operations
    PDF
    This product is exclusive to Digital library subscription
  • Real time LHD dispatch optimisation at Newcrest’s Cadia Valley Operations
    PDF
    Normal price $16.50
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2019
  • PDF Size: 0.467 Mb.
  • Unique ID: P201907051

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.