Skip to main content
Conference Proceedings

Fourth International Mine Ventilation Congress, Brisbane (Proceedings and Addendum volume)

Conference Proceedings

Fourth International Mine Ventilation Congress, Brisbane (Proceedings and Addendum volume)

PDF Add to cart

Ventilation Design and Practice at the Olympic Dam Mine, South Australia

The Olympic mine is currently and development to 1988. The mine practice is, and number of factors. Dam copper-uranium-gold undergoing construction start production in May ventilation design and will be determined by a These include: 1. Mining method and degree of mechanization. 2. Presence of radon emanating material. 3. High virgin rock temperatures at relatively shallow depths. 4. High ambient air temperatures in Summer.
Return to parent product
  • Ventilation Design and Practice at the Olympic Dam Mine, South Australia
    PDF
    This product is exclusive to Digital library subscription
  • Ventilation Design and Practice at the Olympic Dam Mine, South Australia
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1988
  • PDF Size: 0.754 Mb.
  • Unique ID: P198805075

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.