Conference Proceedings
Fourth International Mine Ventilation Congress, Brisbane (Proceedings and Addendum volume)
Conference Proceedings
Fourth International Mine Ventilation Congress, Brisbane (Proceedings and Addendum volume)
Ventilation Design and Practice at the Olympic Dam Mine, South Australia
The Olympic mine is currently and development to 1988. The mine practice is, and number of factors. Dam copper-uranium-gold undergoing construction start production in May ventilation design and will be determined by a These include: 1. Mining method and degree of mechanization. 2. Presence of radon emanating material. 3. High virgin rock temperatures at relatively shallow depths. 4. High ambient air temperatures in Summer.
Contributor(s):
G C Hall, B N Clarke
-
Ventilation Design and Practice at the Olympic Dam Mine, South AustraliaPDFThis product is exclusive to Digital library subscription
-
Ventilation Design and Practice at the Olympic Dam Mine, South AustraliaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1988
- PDF Size: 0.754 Mb.
- Unique ID: P198805075