Skip to main content
Conference Proceedings

Fourth International Mining Geology Conference

Conference Proceedings

Fourth International Mining Geology Conference

PDF Add to cart

Cadia Hill Gold Mine - One Year Down the Track

The Cadia Hill Gold Mine, located near Orange in Central Western New South Wales, is owned and operated by Cadia Holdings Pty Ltd, a wholly owned subsidiary of Newcrest Mining Limited. Construction including pre-strip mining occurred from 1996 to 1998. The mine was officially opened in October 1998 following commissioning of the concentrator and mine fleet in June of that year. The Cadia Hill orebody is a porphyry related gold and copper system. The final pit has a strip ratio of approximately 1.3:1.0. Mining is undertaken on 15 metre benches using large capacity diesel hydraulic face shovels at an annualised rate of up to 70 Mtpa. The concentrator is currently rated at 17Mtpa and includes the world's largest single line grinding circuit. The feasibility Mineral Resource was estimated at 352 Mt at 0.63 g/t Au and 0.17 per cent Cu. Initial reserves totalled 200 Mt at 0.74 g/t Au and 0.17 per cent Cu yielding a mine life of approximately 12 years. During the pre-production period mine geology systems were developed to support the operation. By design these systems were intended to add value to the business through minimisation of material miss-classification, provision of accurate and timely production information and mapping and reconciliation as a continuous model improvement tool. Variances that would prove to be material to the life of mine plan were recognised during the first year of production. These included identification of additional ore tonnes, higher copper grades and higher gold recoveries relative to the model. Gold grades and copper recoveries also reconciled favourably. Testwork was undertaken to determine the underlying causes of each variance. Re-modelling was then undertaken to capitalise on those variances. The Cadia Hill Gold Mine life of mine plan was re-evaluated with updated geology, grade, geotechnical, metallurgical and environmental inputs. Operating strategies were also reviewed and revised. Despite application of reduced metal prices in the evaluation, the outcome was one of extended mine life with more metal produced at lower cost. Development of robust mine geology systems, including a pro-active reconciliation process contributed to tangible improvement of the Cadia Hill Gold Mine operation. On-going system development and improvement initiatives are planned to add further value for the future.
Return to parent product
  • Cadia Hill Gold Mine - One Year Down the Track
    PDF
    This product is exclusive to Digital library subscription
  • Cadia Hill Gold Mine - One Year Down the Track
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2000
  • PDF Size: 1.045 Mb.
  • Unique ID: P200003012

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.