Skip to main content
Conference Proceedings

Fourth International Mining Geology Conference

Conference Proceedings

Fourth International Mining Geology Conference

PDF Add to cart

Mine Geology Practices at the Sunrise Open Pit

The Sunrise deposit is one of Australia's largest and most profitable gold deposits. It has consistently and spectacularly outperformed every resource model created. Currently over the life of the Sunrise pit there has been a 50 per cent under estimation of ounces mined. Without a solid basis for predicting the tonnes and grade or the spatial location of mineralisation, mine planning becomes problematic. Recently, through a better understanding of the mineralising processes the reconciliation of the resource model has improved to be in the order of ten per cent under on ounces mined. This paper will describe how the mine geologists at Placer Granny Smith have implemented the changes required to improve the resource model. Work began with the development of a three-dimensional lithological and structural model based on historical drilling and pit mapping. Continual updating of the geological model with grade control logging, assays and in pit face mapping, now allows for the on-going improvement of the resource model and the planning of mine development drilling.
Return to parent product
  • Mine Geology Practices at the Sunrise Open Pit
    PDF
    This product is exclusive to Digital library subscription
  • Mine Geology Practices at the Sunrise Open Pit
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2000
  • PDF Size: 0.434 Mb.
  • Unique ID: P200003009

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.