Conference Proceedings
Fourth International Mining Geology Conference
Conference Proceedings
Fourth International Mining Geology Conference
Mining Bench Height Evaluation for the Wallaby Resource - A Conditional Simulation Case Study
A study on the feasibility of mining the recently discovered Wallaby gold deposit is due for completion by mid-2000. Open pit mining is the favoured method. Determination of the impact of mining bench height on the recovery of ore, including the estimation of dilution and ore loss, is critical to the economics of the operation. Conditional simulation was used to derive a number of gold estimation scenarios within a typical volume of the deposit. These scenarios were interrogated for a selection of mining bench heights and ore block dimensions. The results were reported as a range of grade tonnage relationships and compared to the kriged resource model. This allowed the resource model to be calibrated to a specific mining bench height and ore block size. Once calibrated, more realistic dilution and ore loss values for a number of mining bench heights were calculated from the resource model. These values were then used to determine the economic sensitivity of particular mining methods. The spread of results from the simulations also provided an indication of the confidence in the kriged grade estimates for the different zones of mineralisation within the deposit and highlighted areas of any significant uncertainty.
Contributor(s):
I M Glacken, M Noppe, M Titley
-
Mining Bench Height Evaluation for the Wallaby Resource - A Conditional Simulation Case StudyPDFThis product is exclusive to Digital library subscription
-
Mining Bench Height Evaluation for the Wallaby Resource - A Conditional Simulation Case StudyPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2000
- PDF Size: 0.788 Mb.
- Unique ID: P200003020