We operate a 50 cubic metre per hour mobile alluvial tin mine on small scattered deposits in the Irvinebank area._x000D_
Wash is loaded by a Cat. 950 front end loader into the bin of a screening section and screen undersize is pumped to a separate jig unit. Both units are rubber tyre mounted and are shifted once a month when the haul distance gets to about 150 metres. The shift takes about 8 hours._x000D_
The screening section is sited close to the face with a ramp for dumping in and a one metre drop for the screen oversize which is removed by the loader._x000D_
A reciprocating plate feeder with variable rate hydraulic drive, feeds wash onto a horizontal 1.2 metre x 2.2 metre two deck Kinergy screen. Minus 10 millimetre undersize is pumped by a Warman 6/4 sand pump with a 37 kW variable speed Reeves Motordrive to the jig unit._x000D_
The jigs are placed 20 to 70 metres away so that tailings will run back into previously mined ground. Reject stone is used to impound the sand and mud, allowing the water to filter through and return to the feed water pump._x000D_
An MTE trapezoidal module is used as a primary jig._x000D_
Hutch product is pumped to an eight cell clean-up jig which we developed ourselves along MTE lines. It has a trapezoidal shape and sawtooth stroke provided by cams. Clean tin is taken from the first four spigots. These consist of clear plastic tubes fitted with taps so that there is no water loss except when the tin is drawn off. Fine concentrate from the last four spigots is put over a curvilinear table which sits on a steel base packed with earth.
Wash is loaded by a Cat. 950 front end loader into the bin of a screening section and screen undersize is pumped to a separate jig unit. Both units are rubber tyre mounted and are shifted once a month when the haul distance gets to about 150 metres. The shift takes about 8 hours._x000D_
The screening section is sited close to the face with a ramp for dumping in and a one metre drop for the screen oversize which is removed by the loader._x000D_
A reciprocating plate feeder with variable rate hydraulic drive, feeds wash onto a horizontal 1.2 metre x 2.2 metre two deck Kinergy screen. Minus 10 millimetre undersize is pumped by a Warman 6/4 sand pump with a 37 kW variable speed Reeves Motordrive to the jig unit._x000D_
The jigs are placed 20 to 70 metres away so that tailings will run back into previously mined ground. Reject stone is used to impound the sand and mud, allowing the water to filter through and return to the feed water pump._x000D_
An MTE trapezoidal module is used as a primary jig._x000D_
Hutch product is pumped to an eight cell clean-up jig which we developed ourselves along MTE lines. It has a trapezoidal shape and sawtooth stroke provided by cams. Clean tin is taken from the first four spigots. These consist of clear plastic tubes fitted with taps so that there is no water loss except when the tin is drawn off. Fine concentrate from the last four spigots is put over a curvilinear table which sits on a steel base packed with earth.
Contributor(s):
M Eden
-
The Operation of a Mobile Alluvial PlantPDFThis product is exclusive to Digital library subscription
-
The Operation of a Mobile Alluvial PlantPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1986
- PDF Size: 0.121 Mb.
- Unique ID: P198609027