Engineering Alternatives for Improved Shaft Sinking Project Payback
Designing for early access to deep orebodies is an essential driver for improved project payback._x000D_
Vertical shaft sinking techniques have been developed to allow concurrent mine level excavation while continuing to sink. Project cash flows can also be improved when simultaneously deepening existing shafts beneath operating hoisting systems. Further economic advantage has been realised through creative sinking sequencing in twin ventilation/service shaft projects. A fourth technique to reduce project schedules involves partial shaft barrel equipping allowing unrestricted access to construct stations and continue with level installations. This approach reduces interference with barrel sinking activities to insignificant proportions._x000D_
This paper reviews how these approaches have added significant value to actual shaft sinking projects, as assessed from a contractor's perspective, and discusses some of the practical issues to be addressed when planning future projects. Designers need to take cognisance throughout all project engineering phases of the adage that you are only sinking when cleaning the face. Cleaning can only be sustained when there is sufficient hoisting capacity.
Vertical shaft sinking techniques have been developed to allow concurrent mine level excavation while continuing to sink. Project cash flows can also be improved when simultaneously deepening existing shafts beneath operating hoisting systems. Further economic advantage has been realised through creative sinking sequencing in twin ventilation/service shaft projects. A fourth technique to reduce project schedules involves partial shaft barrel equipping allowing unrestricted access to construct stations and continue with level installations. This approach reduces interference with barrel sinking activities to insignificant proportions._x000D_
This paper reviews how these approaches have added significant value to actual shaft sinking projects, as assessed from a contractor's perspective, and discusses some of the practical issues to be addressed when planning future projects. Designers need to take cognisance throughout all project engineering phases of the adage that you are only sinking when cleaning the face. Cleaning can only be sustained when there is sufficient hoisting capacity.
Contributor(s):
T E Wakefield
-
Engineering Alternatives for Improved Shaft Sinking Project PaybackPDFThis product is exclusive to Digital library subscription
-
Engineering Alternatives for Improved Shaft Sinking Project PaybackPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2005
- PDF Size: 2.145 Mb.
- Unique ID: P200507016