Skip to main content
Conference Proceedings

Hoist and Haul 2005

Conference Proceedings

Hoist and Haul 2005

PDF Add to cart

Guide Alignment in Mine Shafts

Based on a principle developed at a South African Mine, the CSIR developed a device with which the alignment of guide rails in mine shafts could be measured. Originally the technique could only be used to obtain guide misalignment values at the bunton sets. At the time this was considered adequate since it was assumed that guide realignment could only be done at the support points anyway._x000D_
The technology was developed further and now it is possible to obtain continuous' guide profiles from the measurements. Software was developed with which a guide realignment schedule can be drafted and the shape of the realigned guides can be predicted. A measuring system based on this technology is being used to conduct guide alignment measurements in shafts. The data is then analysed and a realignment schedule is recommended in consultation with the mine. Such a schedule may be prioritised so that the worst sections in the shaft are dealt with first._x000D_
The measurement hardware and analysis software are described. Examples are presented that illustrate the principles and highlight measurement errors. A case study illustrates measurements recorded in a newly equipped shaft. A repeat measurement, 18 months later, shows the effect of recommended realignment as well as the change in guide alignment over this period.
Return to parent product
  • Guide Alignment in Mine Shafts
    PDF
    This product is exclusive to Digital library subscription
  • Guide Alignment in Mine Shafts
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2005
  • PDF Size: 0.843 Mb.
  • Unique ID: P200507030

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.