The Design, Installation and Commissioning of the Northparkes Mines' Lift 2 Ground Handling System

The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated that an annual output of 5 Mtpa was necessary from a depth of approximately 850 m. The shaft that serviced the first lift stopped at a depth of 520 m. This paper covers the selection of the design for the system and the factors that were taken into consideration in making the decision. It will describe the installation program and methodology and highlight areas of significance and then detail some of the issues concerning commissioning of the ground handling system.
Return to parent product
  • The Design, Installation and Commissioning of the Northparkes Mines' Lift 2 Ground Handling System
    PDF
    This product is exclusive to Digital library subscription
  • The Design, Installation and Commissioning of the Northparkes Mines' Lift 2 Ground Handling System
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2005
  • PDF Size: 2.296 Mb.
  • Unique ID: P200507005

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.