Skip to main content
Conference Proceedings

12th International Mining Geology Conference 2022

Conference Proceedings

12th International Mining Geology Conference 2022

PDF Add to cart

Creating optimised drill programs that add real value, and integrate with mine planning

With traditional grade control processes, geological models are created by geologists at the completion of the data collection stage and wireframe construction is closed off at a set date to allow for time to complete the estimation process. Any issues identified at earlier stages or the addition of new data requires the estimation process to be started again. Alternative interpretations are explored only if time allows and often in a limited fashion. An alternative workflow has been developed at the Waihi Underground Gold Mine utilising Leapfrog Edge and Seequent Central. Geological and grade control models are created, dynamically linked, and saved as separate branches. A project geologist is able to work on the grade control model and a mine geologist on the geological model simultaneously. This allows for a non-linear modelling workflow with continual review and feedback. The introduction of new data can occur right up to the model due date, with data collection, validation, alternate interpretation, and review happening incrementally. Models are categorised and stored in Seequent Central according to project status. An approved version of the geological model and grade control estimate are uploaded at the time of release and transparently capture all data used at a point in time, as well as the review process. Dynamically updating models for grade control has reduced turnaround time while increasing accuracy and quality. Estimates of individual domains are vastly improved from being able to rapidly evaluate the effects of model parameter changes in real time and 3D. Development and stope design directly benefit from these streamlined processes, with higher quality, timely production occurring as a result.
Return to parent product
  • Creating optimised drill programs that add real value, and integrate with mine planning
    PDF
    This product is exclusive to Digital library subscription
  • Creating optimised drill programs that add real value, and integrate with mine planning
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2022
  • Pages: 14
  • PDF Size: 0.437 Mb.
  • Unique ID: P-01868-X8D0M2

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.