Skip to main content
Conference Proceedings

12th International Mining Geology Conference 2022

Conference Proceedings

12th International Mining Geology Conference 2022

PDF Add to cart

Grade control and deleterious materials in polymetallic deposits

The Monty Copper Gold Deposit is an ultra-high grade mine in Sandfire Resource’s Doolgunna region which was completely drilled out and developed within two years of commencing mine development. During this period, a total of 986 grade control diamond drill holes were completed, assayed, and validated, 15 levels developed, and 3136 faces mapped. The aggressive schedule meant a high flow of geological data was produced, validated, and incorporated into regular geological model updates. To process this data at a rate which allowed for timely use, more robust data processing methodologies needed to be generated. A new validation system was implemented which required two levels of validation being applied to any diamond drilling update. Step one was the validation of initial physical data including survey pick-ups and logging. This was done prior to new drill data being added to the geological model. Step two was the validation of assay data which was required prior to resource estimation. The implementation of Seequent’s Leapfrog Geo modelling software also allowed for a more seamless and efficient modelling workflow. The use of the Leapfrog Geo vein systems allowed for more rapid generation of geological models which then afforded more time for stringent assessment of the mineralisation system. An example of this was the introduction of cross-shift peer reviews in which opposing rosters of geologists would rigorously evaluate the previous rosters work prior to reporting. This additional level of validation resulted in more robust geological models and the identification of new ore trends. This presentation will detail the evolution of the Monty Geological model from a simple tabular indicated resource into a complex highly refined measured resource. Themes will include how the model was produced using workflows developed and optimised to meet key deliverables.
Return to parent product
  • Grade control and deleterious materials in polymetallic deposits
    PDF
    This product is exclusive to Digital library subscription
  • Grade control and deleterious materials in polymetallic deposits
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2022
  • Pages: 23
  • PDF Size: 0.518 Mb.
  • Unique ID: P-01871-W9B2C7

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.