Skip to main content
Conference Proceedings

12th International Mining Geology Conference 2022

Conference Proceedings

12th International Mining Geology Conference 2022

PDF Add to cart

Regional scale structural influence on the Ernest Henry orebody below current mining levels

Material characterisation, ore sequencing and process capability are commonly regarded as the key parameters to consider in designing and operating an effective pit to plant supply chain. Therefore, an understanding of rock mass properties is the starting point for controlling the presentation of problematic material to the ore handling plant and optimising process utilisation. There are different methodologies for characterising problematic material and ore handleability which exist across a spectrum of sophistication. At one end of this spectrum are simple indices built using first principles geology and at the other are complex algorithms developed using advanced analytical methods, machine learning and ore traceability. Regardless of the method, without an integrated process for careful management of problematic ore, material handling delays (ie blocked, bridged, blinded and buried events) will interrupt the stable flow of production. The ability of the ore control geologist to mitigate these delays is central to the ore handleability challenge. This paper describes a quick and easy solution that links the presentation of ore to the operating window at the crusher. This operating window is based on material characterisation, using the physical, textural and mechanical properties of the rock mass, and crusher performance. It also describes how a basic problematic ore index (POI) can be developed using ore tracking to the production face, petrographic studies of ore texture and mineralogy, and existing variables in the geological model. Finally, this paper will demonstrate that by coding the POI into the geological model for mine planning, together with performance monitoring through compliance to plan routines, material handling delays at the crusher can be reduced, unlocking significant resource value.
Return to parent product
  • Regional scale structural influence on the Ernest Henry orebody below current mining levels
    PDF
    This product is exclusive to Digital library subscription
  • Regional scale structural influence on the Ernest Henry orebody below current mining levels
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2022
  • Pages: 8
  • PDF Size: 0.863 Mb.
  • Unique ID: P-01877-T7Y5W7

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.