Skip to main content
Conference Proceedings

Iron Ore 2002

Conference Proceedings

Iron Ore 2002

PDF Add to cart

Smart Solution to a Sticky Problem - In-Mine Clay Mapping Using High-Resolution Geophysics

Within the Mesa J pisolitic iron ore mine, clay is distributed unevenly throughout the deposit and often forms as pods and channels less than 10 m in width. The mine resource model, based on 50 m_x000D_
50 m spaced drilling, has been unable to accurately delineate the clay for scheduling and mining purposes. Therefore, alternative methods for mapping the clay-contaminated ore were sought. Predictive clay mapping will significantly reduce production costs at Mesa J through improved selective mining practices, more accurate scheduling, reduced wear on mining equipment and minimising the need for maintenance of haul roads and ramps. High lateral resolution electromagnetic (EM) surveying using a Geonics EM31 instrument can quickly and inexpensively delineate the extent and orientation of the clays. Preliminary results indicate that a block model based on the interpretation of the EM data can accurately predict the distribution, volume and tonnage of ore and waste material. While rip-line mapping, infill drilling, ground penetrating radar and gravity can delineate clay with various degrees of success, none were as efficient as EM31.
Return to parent product
  • Smart Solution to a Sticky Problem - In-Mine Clay Mapping Using High-Resolution Geophysics
    PDF
    This product is exclusive to Digital library subscription
  • Smart Solution to a Sticky Problem - In-Mine Clay Mapping Using High-Resolution Geophysics
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2002
  • PDF Size: 2.028 Mb.
  • Unique ID: P200207034

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.