Conference Proceedings
Iron Ore 2011
Conference Proceedings
Iron Ore 2011
The Central Eyre Iron Project - Process Selection and Design
The Iron Road Limited Central Eyre Iron Project (CEIP) area, located on the Eyre Peninsula of South Australia, covers extensive Archaean iron formations that occur as coarse-grained magnetite bearing gneiss. The cumulative strike length, estimated from aeromagnetic data, is at least 95 km.The project is located in a grain growing area 185 km west of the existing iron ore and steel making operations of OneSteel at Whyalla. A narrow gauge railway built to transport agricultural products to the deep-water port of Port Lincoln, 175 km to the south, traverses the project area. A number of well-serviced rural townships are located nearby. Current activities include resource expansion drilling, extensive metallurgical test work, community consultation and a Prefeasibility Study (PFS) that commenced in April 2010.The PFS has encompassed the Central Eyre Iron Project, comprising the three significant iron occurrences (Warramboo, Kopi and Hambidge) and was completed in early 2011. Extensive test work programs and metallurgical modelling confirmed viable process options for the project, using simple off the shelf processing technology.Preconcentration by coarse cobbing yielded promising results, and is the key to reducing not only the capital expenditure but also the operating cost, in particular the power cost, which is the highest operating cost component of a magnetite benefi ciation plant. The ore is also amendable to high pressure grinding rolls (HPGR) processing. This offers a potential for further reduction of the energy requirements.Test work also confirmed that a high grade blast furnace quality concentrate (~68 per cent Fe) can be produced at a relatively coarse grind (P80 106 m).
Contributor(s):
D Connelly, L Ingle
-
The Central Eyre Iron Project - Process Selection and DesignPDFThis product is exclusive to Digital library subscription
-
The Central Eyre Iron Project - Process Selection and DesignPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2011
- PDF Size: 1.084 Mb.
- Unique ID: P201106075