Conference Proceedings
Iron Ore 2011
Conference Proceedings
Iron Ore 2011
Unlocking the Value in Waste and Reducing Tailings - Magnetite Production at Ernest Henry Mining
The Ernest Henry Mine (EHM) is situated 38 km north-east of Cloncurry in the Mount Isa - Cloncurry mineral district of northwest Queensland. The EHM orebody is an iron oxide copper gold deposit with an average grade of one per cent copper, 0.5 g/t gold and 23 per cent magnetite, with current reserves of approximately 88 Mt.The copper concentrator is a single line plant with a nominal throughput rate of 1300 tonnes per hour. An average of 350 000 tonnes of concentrate is produced each year containing around 100 000 tonnes of copper metal and 120 000 troy ounces of gold.In December 2009, Xstrata Copper announced approval of a $589 M investment to extend the life of EHM to at least 2024, through the transformation of open pit mining operations to a major underground mine together with the construction of an associated magnetite extraction plant.The EHM magnetite plant extracts the magnetite from the copper concentrator's tailings stream. It will produce approximately 1.2 Mt of magnetite concentrate per annum at full capacity for export to Asia, making EHM Queensland's first iron ore concentrate exporter. Construction of the magnetite extraction plant commenced in July 2010 and was completed in January 2011.This paper gives an overview of the development of the EHM magnetite extraction plant flow sheet from the early mineralogy and laboratory test work through to the plant commissioning and early operation of the base plant. It has a major focus on the commissioning learnings from the plant start-up and includes a review of the operational performance of the plant versus original design and expectations.
Contributor(s):
J Siliezar, D Stoll, J Twomey
-
Unlocking the Value in Waste and Reducing Tailings - Magnetite Production at Ernest Henry MiningPDFThis product is exclusive to Digital library subscription
-
Unlocking the Value in Waste and Reducing Tailings - Magnetite Production at Ernest Henry MiningPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2011
- PDF Size: 0.976 Mb.
- Unique ID: P201106069