Conference Proceedings
Iron Ore 2013
Conference Proceedings
Iron Ore 2013
Iron Road's Prediction of Magnetite Concentrate Production from the Central Eyre Iron Project
Iron Road Limited is currently studying the feasibility of producing 20 Mt/a of high-grade (67 per cent Fe) magnetite concentrate from a 2.6 Bt resource (JORC) located at Warramboo on the central Eyre Peninsula in South Australia. Bulk concentrate has been tested at a relatively coarse grind size of -106 m. The preliminary flow sheet has been confirmed based on initial mine plans and comprehensive metallurgical testing across the range of mineralisation. Extensive Davis tube testing to predict magnetite recoveries has been conducted over the resource, however this was completed at settings different to the optimised settings developed in the metallurgical test work program.This paper outlines the development of an ore treatment simulation in SysCAD which utilises the mine production plan, the Davis tube test data from the resource, data from metallurgical test work and process design criteria to predict magnetite concentrate deliveries. Mineralogical data, including QEMScan results and metallurgical assessments, were a fundamental basis of the process models which enable predictions of concentrate yield and quality. Power and water requirements are also calculated within the model. SysCAD dynamic simulation has been used to assist with the design of the process plant and downstream infrastructure. The simulation has been set-up to allow iterative integration and optimisation of the mine plan when it becomes available.CITATION:Semler, N J, Marsh, P J and Bartsch, P J, 2013. Iron Road's prediction of magnetite concentrate production from the Central Eyre Iron Project, in Proceedings Iron Ore 2013 , pp 539-546 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
N J Semler, P J Marsh, P J Bartsch
-
Iron Road's Prediction of Magnetite Concentrate Production from the Central Eyre Iron ProjectPDFThis product is exclusive to Digital library subscription
-
Iron Road's Prediction of Magnetite Concentrate Production from the Central Eyre Iron ProjectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2013
- PDF Size: 1.307 Mb.
- Unique ID: P201306070