Test Work and Design of a Gravity Circuit for Iron Road's Central Eyre Iron Project
Iron Road Limited (Iron Road) is currently evaluating the feasibility of producing 21.5 Mt/a of high-grade (>66 per cent Fe) magnetite concentrate from a 3.7 Bt resource (JORC) located at Warramboo on the central Eyre Peninsula in South Australia. Bulk concentrate can be produced via a conventional grind and low-intensity magnetic separation flow sheet. Due to the comparatively coarse magnetite liberation size (106 m), consideration was given to enhancing both the grind economics and coarser product sizing via gravity separation.This paper outlines the test work, flow sheet design and engineering design of a gravity beneficiation circuit (GBC) conducted by Mineral Technologies for Iron Road. The resulting circuit optimisation necessitated mass balance simulation by Iron Road's SysCAD model to quantify the resulting changes in mill recirculation load. This included the determination of project-critical grinding power and energy requirements with and without the GBC installed into the primary ball mill classification circuit. The outcome of this work was the design of a GBC, including spirals and up-current classification, which led to a substantial reduction (33 per cent) in ball mill recirculating load and power requirements, together with a favourable coarsening of final product size due to the relatively coarser gravity concentrate. This has led to a significant reduction in project design capital and operating costs. A further benefit of this approach is increased recovery of (paramagnetic) hematite and lesser titano-hematite via gravity separation compared to an all-magnetic separation approach.CITATION:Hunt, A G, Showers, G J and Botman, P, 2015. Test work and design of a gravity circuit for Iron Road's Central Eyre Iron Project, in Proceedings Iron Ore 2015, pp 139-142 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
A G Hunt, G J Showers, P Botman
-
Test Work and Design of a Gravity Circuit for Iron Road's Central Eyre Iron ProjectPDFThis product is exclusive to Digital library subscription
-
Test Work and Design of a Gravity Circuit for Iron Road's Central Eyre Iron ProjectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2014
- PDF Size: 3.959 Mb.
- Unique ID: P201505020