Integrated Whaleback Planning and Scheduling System
Various software packages are discussed. These are components of an Integrated Planning and Scheduling System developed by MVM with the aim of providing up-to-date information for the Whaleback operation on: 1. Mine Topography. 2. Status of equipment in the mine._x000D_
3. Material moved from and within the mine. 4. Volume and density of same._x000D_
5. Quality of same.