Skip to main content
Conference Proceedings

Large Open Pit Mining Conference, Newman

Conference Proceedings

Large Open Pit Mining Conference, Newman

PDF Add to cart

Limits Excavation at Mt Whaleback

Within the Mt Whaleback open cut mine the integrity of the final pit wall is achieved through careful rock slope design, use of rock reinforecement technology where marginal stability exists and use of controlled blasting techniques and excavation practices. By reducing the effective density of ANFO explosive within blastholes to around 0.2 glcm', and developing standard blast pattern designs for various rock types, blast damage to pit walls has been minimised._x000D_
Accurate geological prediction is necessary for optimum blast design. Controlled blasting is undertaken where blasting occurs within 90 m of the designed final batter crest and hole by hole assessment of final limit blast patterns is undertaken before pattern charging. Shovels and trucks remove the bulk of blasted and dozed rock material, but due to the mine's variable pit wall slope configuration, bulldozer excavation of some critical design batters has been successfully Implemented.
Return to parent product
  • Limits Excavation at Mt Whaleback
    PDF
    This product is exclusive to Digital library subscription
  • Limits Excavation at Mt Whaleback
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1986
  • PDF Size: 1.192 Mb.
  • Unique ID: P198606019

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.