Skip to main content
Conference Proceedings

Large Open Pit Mining Conference, Newman

Conference Proceedings

Large Open Pit Mining Conference, Newman

PDF Add to cart

Product Monitoring, Grade Control, and Ore: Waste Reconciliation at Bougainville Copper Limited (BCL)

An effective production control system should maximise recovery of economic material from the resource. To do this, internal waste must be accurately delineated and efficiently removed. Achieving this is most difficult in low grade blocks just above and just below the cut off grade, where ore:waste separation follows assay or statistical, rather than geological boundaries. Difficulties arise from sampling errors, configuration of the economic mineralisation, and local variations in geology. Mine bench parameters and mining equipment size apply further constraints to the actual field separation of the ore from the waste. At BCL, management of the resource starts with an effective orebody model for planning, scheduling and ore:waste prediction. Ore production from each mining location is reconciled with concentrator tonnage and grade, and the reconciled grades are compared with the planning orebody model to highlight any Differences.
Return to parent product
  • Product Monitoring, Grade Control, and Ore: Waste Reconciliation at Bougainville Copper Limited (BCL)
    PDF
    This product is exclusive to Digital library subscription
  • Product Monitoring, Grade Control, and Ore: Waste Reconciliation at Bougainville Copper Limited (BCL)
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1986
  • PDF Size: 0.676 Mb.
  • Unique ID: P198606024

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.